enquiries@constructionproductsdirect.co.uk

0844 4171864

Menu
Pile Pulling-Camlock

Pile Pulling-Camlock

pile pulling clamps are designed to pull out driven piles or trench shielding. The clamps have a narrow opening and a deep slot to ensure that the pile is gripped firmly. It is extremely difficult to determine the forces required to pull out driven piles so it is recommended that a load indicator is used to ensure the WLL of the clamp is not exceeded.

The PP clamp is supplied as standard with a double locking mechanism to ensure that the clamp remains ‘locked on’ and does not become unlocked during extraction of the pile.

£665.00 ex. VAT

Trade prices available on request subject to volume, call 0844 4171864